The CFS DUO SMALL series: BAUER filling stations combining excellent performance with outstanding modularity

CFS DUO SMALL
CFS DUO SMALL
CFS DUO SMALL with sound insulation and weather protection
CFS DUO SMALL with sound insulation and weather protection

Excellent daily capacity: For up to 200 passenger cars/day or 20 HGV/day

The very latest technology and safety: In the very best BAUER quality

Designed for use wherever space is at a premium: Compact, modular design combined with powerful performance

Global spare parts guarantee over 25 years: Your investment could not enjoy better protection

On-site installation and commissioning by experts: Our experienced specialists and engineers will attend your site to carry out this work

The compact and expandable station has been dimensioned for the most exacting safety standards and in particular for large depots and public filling stations with a daily capacity of up to 200 passenger cars/day or 20 HGV/day.

Its outstanding quality, uncompromising safety standards and impressive design and innovation solutions "Made by BAUER" are the key to ensuring that modern filling stations can be relied upon at all times, even under peak load.

Furthermore, very long service life and optimum spare parts availability (over 25 years) provide your investment with the very best protection.

The basic version of the CFS DUO is designed for entry-level operation with one compressor and a storage system.

If the number of vehicles to be serviced daily increases, a second compressor (DUO II) can easily be added to the station and – should refuelling peaks rise – a second storage rack.

With its clear modular structure, this CFS station from the DUO series can be equipped initially with a compressor of the appropriate size for the individual application concerned.

All the information you need at your fingertips!

B-CONTROL II operator display
B-CONTROL II operator display

Compressor control
BAUER's B-CONTROL II fully automatic compressor control regulates and monitors all functions of the natural gas filling station from gas input to filling device. Read more

CNG (IK 22) compressor block
CNG (IK 22) compressor block

Compressor block
The BAUER compressor blocks have been designed specifically for CNG applications. Exceeding the requirements of all international safety standards, they are characterised by their high energy efficiency and reliability under the most demanding conditions. Read more

Dryer P 200-C
Dryer P 200-C

High-pressure gas treatment system
The high-pressure gas treatment system (high-pressure filter) is installed downstream of the compressor on the pressure side. Its primary function is to effectively remove excess moisture and possible oil deposits from the natural gas. Read more

CFS DUO SMALL in concrete housing
CFS DUO SMALL in concrete housing

Sound insulation and weather protection
The entire unit is integrated inside a housing made from concrete or steel for sound insulation and weather protection.
This provides the best possible protection against the most extreme ambient conditions and, thanks to the use of air handling units or heating systems, can be used in temperature ranges of ±55°C.
Tailored to meet your individual needs, our housings can be fitted with additional important options such as protection against sandstorms.

Storage: B 2000 storage system (1-rack / 3-rack)
Storage: B 2000 storage system (1-rack / 3-rack)

Storage system
The storage systems, which are made up of a number of special high-pressure vessels, are scalable, modular by design and suitable for installation both indoors and outdoors. Read more

Filling and refuelling control
Filling and refuelling control

Filling and refuelling control
Filling and refuelling control regulates the priority in which the high-pressure storage system is filled. During refuelling, it also regulates the sequence in which gas is withdrawn from the high-pressure storage system. Read more

C design fill post, Europe
C design fill post, Europe

Dispenser/Fill post
This dispensing unit is used for depot refuelling or in public filling stations. Read more

TÜV approval
TÜV approval

TÜV approval
During technical parts approval testing in the factory prior to delivery, the TÜV carries out comprehensive pressure and safety testing as well as testing the electrical equipment.

Natural gas filling station installation – Project: ARAL, Munich, Schenkendorfstraße
Natural gas filling station installation – Project: ARAL, Munich, Schenkendorfstraße

Installation/Commissioning
Our regional service teams deliver expert installation and commissioning including comprehensive operator induction. This ensures smooth operation at all times. Read more

Scope of delivery, basic version
Scope of delivery, basic version

Scope of delivery, basic version
Complete compressor unit ready for operation. Read more

Capacity overview: CFS DUO SMALL series

Free delivery [Nm³/h]
(0°C, 1013 mbar)

Technical data for the CFS DUO SMALL
Technical data for the CFS DUO SMALL

Gas intake pressure [barg]